Updated December 23 2016 - 2:00 pm

Forecast as of 2:00pm

-Today – air temp above 0 thru Sunday morning
- Saturday – 40% POP of 1cm of rain/snow mix from 2am to 9am
- Monday – 60% POP of rain from 5am to 7pm

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 2:00pm on Friday December 23, 2016

Arterial Road
No Activity

Collector Roads
No Activity

Local Roads
No Activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Snow Removal
2 contracted crews to undertake snow removal on MTO and City bridges from 8pm Dec 23 to 6am Dec 24 am

BRIDGES LISTED BELOW are scheduled to be completed Dec 23 - 24:

Eglinton North
1. Finch Ave 6900 Finch Ave to Missisauga
2. Dixon Rd S/S Martingrove to Lavington Dr
3. Dixon Rd S/S Kipling Ave to Islington Ave
4. Jane St Denison Ave to Weston Rd
5. Lawrence Ave - Scarlett Rd to Hickory Tree Rd.

Download (PDF, 341KB)

Updated December 23 2016 - 8:00 am

Forecast as of 8:00am

-Today – air temp above 0 thru Sunday morning
- Saturday – 40% POP of 1cm of rain/snow mix from 2am to 9am
- Monday – 60% POP of rain from 5am to 7pm

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Friday December 23, 2016

Arterial Road
No Activity

Collector Roads
No Activity

Local Roads
No Activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Park Lawn)
No Activity

Sidewalks
SIdewalk tractors to be deployed 9:30 am plowing and salting as required - completed 9:00 pm

Bus Stops and Crosswalks
Sidewalk Tractors to salt and clear as required 9:00 am - 9:00pm

Seniors Sidewalks
No Activity

Snow Removal
4 contracted crews with continue with snow removal on MTO and City bridges from 8pm Dec 22 to 5am Dec 23 am

BRIDGES LISTED BELOW scheduled to complete Dec 22 - 23:

Eglinton North

1. Kipling Ave - Belfield Opposite St Andrews Blvd - COMPLETED
2. Martingrove Rd - Hwy 409 E/B off Ramp to Enterprise Rd - COMPLETED
3. Renforth Dr - Hwy 401 W/B on ramp to Hwy 427 S/B on ramp - COMPLETED
4. Dixon Rd - Hwy 27 NB ramp to Attwell Dr - COMPLETED
5. St. Phillips Rd -Weston Rd to Riverview heights - COMPLETED
6. Islington Ave. from Dixon Rd. to Fenely Dr. - COMPLETED

South of Eglinton

1. The Queensway- West of the West Mall - COMPLETED
2. The Queensway- West of Kipling Ave - COMPLETED
3. Islington Ave - south of Evans - COMPLETED
4. The Queensway at Parklawn Rd. - COMPLETED
5. Grand Ave south of the Queensway - COMPLETED
6. Lakeshore Blvd West of Parklawn - COMPLETED
7. The Queensway over the Humber - COMPLETED
8. Eglinton ave west of Rakley - COMPLETED
9. Eglinton ave east of the East Mall - COMPLETED
10. Scarlett Rd South of Eglinton Ave - COMPLETED
11. Islington at Dundas - COMPLETED
12. Islington Ave south of Dundas - COMPLETED
13. Bloor St East of Islington - COMPLETED

Download (PDF, 344KB)

Updated December 22 2016 - 3:00 pm

Forecast as of 3:00pm

Today - +4 day time temperatures falling to -2 overnight
Friday – rain late evening
Next snow – Wed. Dec. 28th 30% POP of 6 cm starting at 8pm to 11am Thursday morning

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 3:00pm on Thursday December 22, 2016

Arterial Road
No Activity

Collector Roads
No Activity

Local Roads
1 round on salting Completed 10:15 am

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Park Lawn)
No Activity

Sidewalks
SIdewalk tractors to be deployed 9:30 am plowing and salting as required Est Completion 10:30 pm (details attached)

Bus Stops and Crosswalks
Sidewalk Tractors to salt and clear as required 9:00 am - 10:30 pm EST

Seniors Sidewalks
No Activity

Snow Removal
4 contracted crews with continue with snow removal on MTO and City bridges from 8pm Dec 22 to 5am Dec 23 am

BRIDGES LISTED BELOW scheduled to complete Dec 22 - 23:

Eglinton North

1. Kipling Ave - Belfield Opposite St Andrews Blvd
2. Martingrove Rd - Hwy 409 E/B off Ramp to Enterprise Rd
3. Renforth Dr - Hwy 401 W/B on ramp to Hwy 427 S/B on ramp
4. Dixon Rd - Hwy 27 NB ramp to Attwell Dr
5. St. Phillips Rd -Weston Rd to Riverview heights
6. Lawrence Ave - Scarlett Rd to Hickory Tree Rd.

South of Eglinton

1. The Queensway- West of the West Mall
2. The Queensway- West of Kipling Ave
3. Islington Ave - south of Evans
4. The Queensway at Parklawn Rd.
5. Grand Ave south of the Queensway
6. Lakeshore Blvd West of Parklawn
7. The Queensway over the Humber
8. Eglinton ave west of Rakley
9. Eglinton ave east of the East Mall
10. Scarlett Rd South of Eglinton Ave
11. Islington at Dundas
12. Islington Ave south of Dundas
13. Bloor St East of Islington
In-house crews continue with Service Request based school loading zones & sight line issues working from 630am to 230pm Completed

Download (PDF, 348KB)

Updated December 22 2016 - 8:00 am

Forecast as of 8:00am

Today - +4 day time temperatures falling to -2 overnight
Friday – rain late evening
Next snow – Wed. Dec. 28th 30% POP of 6 cm starting at 8pm to 11am Thursday morning

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Thursday December 22, 2016

Arterial Road
1 round of Salting complete
Anti Icing Completed 10:00pm Dec 21

Collector Roads
1 round of Salting complete
Anti Icing Completed 10:00pm Dec 21

Local Roads
1 round on salting ongoing EST completion 9:00am

Laneway Roads
Monitoring 6:30 - 2:30 pm
Humber Bay Waterfront Trail (Humber River to Park Lawn)
1 round of Salting and plowing completed

Sidewalks
SIdewalk tractors to be deployed 9:30 am plowing and salting as required Est Completion 10:30 pm (details attached)

Bus Stops and Crosswalks
Sidewalk Tractors to salt and clear as required 9:00 am - 10:30 pm EST

Seniors Sidewalks
No Activity

Snow Removal
4 contracted crews completed snow removal on MTO and City bridges from 8pm Dec 21 to 5am Dec 22 am

BRIDGES LISTED BELOW completed Dec 21-22 overnight:

Eglinton North
1. Islington Ave. over Hwy 401 COMPLETED
2. Martingrove Rd. over the west branch of Humber River COMPLETED

South of Eglinton
1. Rathburn over Highway 427 COMPLETED
2. Rathburn Rd. East of Martin Grove COMPLETED
3. Burnhamthorpe Rd. West of Mill Rd. COMPLETED
4. Bloor St. West of Mill Rd. COMPLETED
5. The Queensway West of Kipling COMPLETED
6. West Mall over Dundas COMPLETED
7. Martingrove North of Rathburn COMPLETED
8. Kipling Ave. North of Burnhamthorpe COMPLETED
9. Dundas at Royal York COMPLETED
10. Royal York North of Norseman COMPLETED
11. Lakeshore Blvd. West of 42nd St. COMPLETED

In-house crews continue with Service Request based school loading zones & sight line issues working from 630am to 230pm

Download (PDF, 347KB)

Updated December 21 2016 - 3:00 pm

Forecast as of 3:00pm

-Today – 20% POP for 1cm of snow from 9pm this evening to 2am Thursday morning
- low tonight -1 air, -2 road
- high tomorrow +4 air, +6 road
-Friday – rain after 11pm to 9am Saturday morning
-next snow – Wed. Dec. 28th 40% POP of starting at 2pm to 5am Thursday morning 7cm

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 3:00pm on Wednesday December 21, 2016

Arterial Road
Anti-icing north of Eglinton on Arterial hills and bridges deployed 10:00am Estimated completion 5:00pm

Anti-icing south of Eglinton scheduled on Arterial hills and bridges under Depot-5 commencing at 8:30 PM tonight expected finish time 1:30am, Dec. 22
Application rate of 100litres per lane KM

Collector Roads
Anti-icing north of Eglinton on Arterial hills and bridges 10:00am Estimated completion 5:00pm

Anti-icing south of Eglinton scheduled on Arterial hills and bridges under Depot-5 commencing at 8:30 PM tonight expected finish time 1:30am, Dec. 22.
Application rate of 100litres per lane KM

Anti-icing on Steep Local Hills hills deployed 10:00am Estimated completion 5:00pm
Application rate of 200 Liters per lane KM

Local Roads
No activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Snow Removal
4 contracted crews will undertake snow removal on MTO bridges from 8pm Dec 20 to 5am Dec 21 over the next 3 nights Estimated completion 5:00am Dec 23rd

BRIDGES LISTED BELOW:

Eglinton North
1. Renforth Dr. over Hwy 401
2. Islington Ave. over Hwy 401
3. Kipling Ave. over Hwy 401
4. Martingrove Rd. over the west branch of Humber River
5. Martingrove over Hwy 409
6. Dixon Rd. Hwy 27 n/bound ramp to Attwell Dr.
7. St. Phillips Rd. Weston Rd. to Riverview Heights
8. Lawrence Ave. Scarlett Rd. to Hickory Tree

South of Eglinton
1. Burnhamthorpe Rd at Highway 427
2. Rathburn over 427
3. Rathburn Rd. East of Martin Grove
4. Burnhamthorpe Rd. West of Mill Rd.
5. Bloor St. East of Islington
6. Bloor St. West of Mill Rd.
7. The Queensway West of Kipling
8. West Mall over Dundas 9. Martingrove North of Rathburn
9. Kipling Ave. North of Burnhamthorpe Rd.
10. Islington South of Dundas
11. Dundas at Royal York
12. Royal York North of Norseman
13. Lakeshore Blvd. West of 42nd St.

Download (PDF, 347KB)

Updated December 21 2016 - 8:00 am

Forecast as of 8:00am

– 20% POP for 1cm of snow from 9pm this evening to 4am Thursday morning
- High today 0 from 6pm to 6am Thursday morning, high Thursday +3

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 9:00am on Wednesday December 21, 2016

Arterial Road
Anti-icing north of Eglinton scheduled on Arterial hills and bridges to be deployed 10:00am Estimated completion 2:30pm Dec 21

Anti-icing south of Eglinton scheduled on Arterial hills and bridges under Depot-5 commencing at 8:30 PM tonight expected finish time 1:30am.
Application rate of 100litres per lane KM

Collector Roads
Anti-icing north of Eglinton scheduled on Arterial hills and bridges to be deployed 10:00am Estimated completion 2:30pm Dec 21
Anti-icing south of Eglinton scheduled on Arterial hills and bridges under Depot-5 commencing at 8:30 PM tonight expected finish time 1:30am.
Application rate of 100litres per lane KM
Anti-icing scheduled on Steep Local Hills hills to be deployed 10:00am Estimated completion 2:30pm Dec 21
Application rate of 200 Liters per lane KM

Local Roads
No Activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
2 in-house crews continue with school loading zones & sight line issues working from 6:30am to 2:30pm

Seniors Sidewalks
No Activity

Snow Removal
1 in-house crew clearing school loading zones service requests
locations on Runnymede and Clearing sight line issues 630am to 230pm

Download (PDF, 346KB)

Updated December 20 2016 - 9:30 pm

Forecast as of 9:30pm

Tomorrow – 40% POP for snow from 10pm to 2am Thursday – 1-3cm

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 9:00pm on Tuesday December 20, 2016

Arterial Road
No Activity

Collector Roads
No Activity

Local Roads
Salting Deployed 10:00am Completed 7:15pm

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Snow Removal
3 contracted crews will undertake snow removal on MTO bridges from 8pm Dec 20 to 5am Dec 21 (Estimated final completion 5:00am Dec 23rd)

Eglinton North
1 Sheppard Ave over Hwy 400
2 Weston Rd over Hwy 401
3 Renforth Dr over Hwy 401
4 Islington Ave over Hwy 401
5 Kipling Ave over Hwy 401
6 Islington over west branch of Humber River
7 Martingrove over west branch of Humber River
8 Martingrove over Hwy 409
9 Finch over Humber River west of Humberline Drive

South of Eglinton
1 Rathburn Rd at Hwy 427
2 Burnhamthorpe Rd at Hwy 427
3 Bloor St at Hwy 427
4 Evans Ave at Hwy 427
5 Evans Ave at Brownsline
6 The Queensway at Hwy 427
7 Kipling at the QEW
8 Islington at the QEW
9 Dundas St at Hwy 427
10 Royal York Rd over QEW

Download (PDF, 344KB)

Updated December 20 2016 - 3:00 pm

Forecast as of 3:00pm
Tomorrow – 40% POP for snow from 10pm to 10am Thursday – 1.7cm
Next snow – Wed. Dec. 28th starting at 2am and potential for 3cm
Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 3:00pm on Tuesday December 20, 2016

Arterial Road
No Activity

Collector Roads
No Activity

Local Roads
Salting Deployed 10:00am estimated completion 8:00pm

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
Missed location clearing and salting 6:30am - 2:30 pm Completed

Snow Removal
4 contracted crews will undertake snow removal on MTO bridges from 8pm Dec 20 to 5am Dec 21 (Estimated final completion 5:00am Dec 23rd)

Eglinton North
1 Sheppard Ave over Hwy 400
2 Weston Rd over Hwy 401
3 Renforth Dr over Hwy 401
4 Islington Ave over Hwy 401
5 Kipling Ave over Hwy 401

South of Eglinton
1 Rathburn Rd at Hwy 427
2 Burnhamthorpe Rd at Hwy 427
3 Bloor St at Hwy 427
4 Evans Ave at Hwy 427
5 Evans Ave at Brownsline
6 The Queensway at Hwy 427
7 Kipling at the QEW
8 Islington at the QEW
9 Dundas St at Hwy 427
10 Royal York Rd over QEW

1 in-house crew clearing school loading zones service requests
locations on Runnymede and Clearing sight line issues 630am to 230pm

Download (PDF, 346KB)

Updated December 20 2016 - 10:00 am

Forecast as of 8:00am Tuesday December 20, 2016
Tomorrow – 40% POP for snow from 10pm to 10am Thursday – 1.7cm
Next snow – Wed. Dec. 28th starting at 2am and potential for 3cm

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Tuesday December 20, 2016

Arterial Road
Winging back Completed Eglinton North 5:55am
AM /PM clean Completed

Collector Roads
No Activity

Local Roads
Salting Deployed 10:00am estimated completion 8:00pm

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
Missed location clearing and salting 6:30am - 2:30 pm

Snow Removal
1 in-house crew clearing school loading zones service requests
locations on Runnymede and Clearing sight line issues 630am to 230pm

Download (PDF, 337KB)

Updated December 20 2016 - 8:00 am

Forecast as of 8:00am Tuesday December 20, 2016
Tomorrow – 40% POP for snow from 10pm to 10am Thursday – 1.7cm
Next snow – Wed. Dec. 28th starting at 2am and potential for 3cm

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Tuesday December 20, 2016

Arterial Road
Winging back Completed Eglinton North 5:55am
AM /PM clean Completed

Collector Roads
No Activity

Local Roads
No Activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
Missed location clearing and salting 6:30am - 2:30 pm

Snow Removal
1 in-house crew clearing school loading zones service requests
locations on Runnymede and Clearing sight line issues 630am to 230pm

Download (PDF, 341KB)

Updated December 19 2016 - 4:00 pm

Forecast as of 4:00pm Monday December 19, 2016
Cold and Dry conditions over the next 24 hours
no precipitation in forecast until Saturday 7am and calling for rain

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 4:00pm on Monday December 19, 2016

Arterial Road

Winging back scheduled overnight 9:00pm - 6:00am Eglinton North (day 2 of 2)
PM clean up 4:00pm to 7:00pm EST
AM Clean Up completed

Collector Roads
Salting South of Eglinton 4:30am to 10:35am completed

Local Roads
Salting deployed 3:30am to 12:45 pm Completed

Laneway Roads
No Activity

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
(2 overlapping snow events details attached)

No Activity

Snow Removal
Details attached

Download (PDF, 344KB)

Updated December 19 2016 - 8:00 am

Forecast as of 8:00am Monday December 19, 2016

Road temps to go above 0 for only a short time between 1pm and 3pm
Air temp high of only -7
No precipitation in forecast until Saturday 7am and calling for rain

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Monday December 19, 2016

Arterial Road
Winging back completed overnight 9:00pm - 6:00am Eglinton North (day 1 of 2)
AM and PM clean up scheduled for Dec 19th (details attached)

Collector Roads
Salting South of Eglinton 4:30am to 8:30 am est

Local Roads
Salting deployed 3:30am to 1:30 pm est

Laneway Roads
2nd Round commenced (wards 17 & 13) 7:30 am Dec 18 Completed 7:00am Dec 19th

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Activity

Sidewalks
Sidewalk clearing/salting deployed 7:00am completed 7:00 pm
Manual Locations 7:00am completed 7:00pm

Bus Stops and Crosswalks
Bus Stops equipment deployed 6:00pm on going completed 6:00am Dec19

Seniors Sidewalks
(2 overlapping snow events details attached)
No Activity

Download (PDF, 344KB)

Updated December 18 2016 - 3:00 pm

Forecast as of 3:00pm
Temps at 7am (-1) plunging to (-13) by midnight until Tuesday morning
Dry road conditions as of noon Monday

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 3:00pm on Sunday December 18, 2016

Arterial Road
Winging back scheduled to commence 9:00pm Eglinton North
AM and PM clean up scheduled for Dec 19th (details attached)

Collector Roads
No Current Activity

Local Roads
Clean up Plowing operations commenced 6:00am Completed 5:00pm

Laneway Roads
2nd Round commenced (wards 17 & 13) 7:30 am Dec 18 estimated completion 12:01 Dec 19th

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
Equipment deployed to Salt and plow as necessary 6:45 am Completed 3:00pm

Sidewalks
Sidewalk clearing/salting deployed 7:00am Estimated completion 7:00 pm
Manual Locations 7:00am estimated completion 7:00pm

Bus Stops and Crosswalks
Bus Stops equipment deployed 6:00pm on going estimated completion 5:00am Dec19

Seniors Sidewalks
(2 overlapping snow events details attached)
Senior clearing commenced 6:00am completed 4:30pm Dec 18

Download (PDF, 243KB)

Updated December 18 2016 - 8:00 am

Forecast as of 8:00am Sunday December 18, 2016

80% POP 1.4 cm thru Sunday Noon additional 5 cm between 3pm Sunday and 6am Monday morning
Temps at 7am (-1) plunging to (-13) by midnight until Tuesday morning
Dry road conditions as of noon Monday

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Sunday December 18, 2016

Arterial Road
Salters deployed South of Eglinton EST Completion 9:15 am
Salters deployed Eglinton North completed 7:30am
Clean Up operations completed (details attached)

Collector Roads
Salters deployed Eglinton North 7:50am estimated completion 12:20pm
Clean up Plowing operations commenced 6:00am EST completed 2:00pm

Local Roads
Clean up Plowing operations commenced 6:00am EST completed 2:00pm
Salters deployed 7:00pm Dec 17 completed 5:00am Dec 18

Laneway Roads
2nd Round commenced (wards 17 & 13) 7:30 am Dec 18 estimated completion 12:01 Dec 19th
1st Round Completed 6:00am Dec 18

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
Equipment deployed to Salt and plow as necessary 6:45 am Estimated completion 3:45pm

Sidewalks
Sidewalk clearing/salting deployed 7:00am Estimated completion 7:00 pm
Manual Locations 7:00am estimated completion 8:00pm

Bus Stops and Crosswalks
Bus Stops equipment deployed 6:00pm on going estimated completion 12:01pm

Seniors Sidewalks
(2 overlapping snow events details attached)
Senior clearing commenced 6:00am until 4:30pm Dec 18
Scheduled to resume 6:00am Dec 19th

Download (PDF, 243KB)

Updated December 17 2016 - 8:00 pm

Forecast as of 8:00pm
Freezing rain from 6 pm to 11pm this evening
Temps above 0 from 3:00pm to 6am Sunday morning then drop to -14 by Monday 3am
2.1 cm of more snow from present thru 9am Sunday morning
Dry road conditions as of 1pm Sunday afternoon through Wednesday

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00pm on Saturday December 17, 2016

Arterial Road
Salters deployed Eglinton North 7:30pm estimated completion 10:00pm
Layby Parking clean up scheduled for 12:01 AM Dec 18
Bike lane clean up ongoing until 9:00pm
Clean up operations ongoing including Turn lanes, driveway openings Completed
Driveway opening on arterial roads completed 5:00pm

Collector Roads
Salters deployed 7:40pm estimated completion 12:15am Dec 18
3rd round salting Completed 5:00pm pm
Plowing commenced 6:00am completed 1:30pm

Local Roads
Plowing commenced immediately following collector road completion 1:30pm to 7:00pm EST

Laneway Roads
salting on going until completed

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Current Activity

Sidewalks
Sidewalk clearing deployed 7:30 am Estimated completion 8:30 pm

Bus Stops and Crosswalks
Bus Stops equipment deployed 6:00pm on going until completed

Seniors Sidewalks
( 2 overlapping snow events details attached)
Senior clearing commenced 6:00am until 6:00pm
Scheduled to resume 6:00am Dec 18th

Download (PDF, 241KB)

Updated December 17 2016 - 6:00 pm

Forecast as of 6:00pm
40% POP for freezing rain from 5 pm to 11pm this evening
Temps above 0 from 3:00pm to 6am Sunday morning then drop to -14 by Monday 3am
2.1 cm of more snow from present thru 9am Sunday morning
Dry road conditions as of 1pm Sunday afternoon through Wednesday

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 6:00pm on Saturday December 17, 2016

Arterial Road
Layby Parking clean up scheduled for 12:01 AM Dec 18
Bike lane clean up ongoing until 9:00pm
Clean up operations ongoing including Turn lanes, driveway openings Completed
Driveway opening on arterial roads completed 5:00pm

Collector Roads
3rd round salting Completed 5:00pm pm
Plowing commenced 6:00am completed 1:30pm

Local Roads
Plowing commenced immediately following collector road completion 1:30pm to 7:00pm EST

Laneway Roads
salting on going until completed

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
No Current Activity

Sidewalks
Sidewalk clearing deployed 7:30 am Estimated completion 8:30 pm

Bus Stops and Crosswalks
Bus Stops equipment deployed 6:00pm on going until completed

Seniors Sidewalks
( 2 overlapping snow events details attached)
Senior clearing commenced 6:00am until 6:00pm
Scheduled to resume 6:00am Dec 18th

Download (PDF, 242KB)

Updated December 17 2016 - 1:30 pm

Forecast as of 1:30pm
40% POP for freezing rain and ice pellets from 5 pm to 11pm this evening
Temps above 0 from Noon to 6am Sunday morning
1.3cm of more snow from 11pm this evening thru 9am Sunday morning

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 1:30pm on Saturday December 17, 2016

Arterial Road
Clean up operations ongoing including Turn lanes, driveway openings and bike lanes see advisory for details
Driveway opening on arterial estimated completion 2:00pm
2nd round plowing Completed 12:00noon

Collector Roads
3rd round salting deployed 1:30 pm
Plowing commenced 6:00am completed 1:30pm

Local Roads
Plowing commenced immediately following collector road completion 1:30pm to 7:00pm EST

Laneway Roads
salting on going until completed

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
2nd round salting and plowing Completed 1:15 pm

Sidewalks
Sidewalk clearing deployed 7:30 am Estimated completion 8:30 pm

Bus Stops and Crosswalks
Scheduled to be deployed 6:00pm on going until completed

Seniors Sidewalks
Senior clearing commenced 6:00am until 2:30 pm
Scheduled to resume 6:00am Dec

Download (PDF, 239KB)

Updated December 17 2016 - 7:30 am

Forecast as of 8:00am
Potential for freezing rain and ice pellets from 1 pm to 11pm this evening
Temps above 0 from Noon to 6am Sunday morning
2cm of more snow from 11pm this evening thru 9am Sunday morning

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Saturday December 17, 2016

Arterial Road
Clean up operations ongoing including Turn lanes, driveway openings and bike lanes see advisory for details
2nd round plowing estimated completion 11:00am
1 round of plowing completed
2 rounds of Salting completed

Collector Roads
Plowing commenced 6:00am to estimated 1:00pm
2 rounds of salting completed

Local Roads
Plowing to commence immediately following collector road completion estimated 1:00pm to 7:00pm

Laneway Roads
salting on going until completed

Humber Bay Waterfront Trail (Humber River to Marie Curtis Park)
2nd round salting and plowing estimated completion 2:30 pm
Salter/plow deployed 9:00pm Dec 16 Completed 3:30am

Sidewalks
Sidewalk clearing deployed 7:30 am Estimated completion 8:30 pm

Bus Stops and Crosswalks
Scheduled to be deployed 6:00pm on going until completed

Seniors Sidewalks
Senior clearing commenced 6:00am

Download (PDF, 241KB)

Updated December 16 2016 - 10:00 pm

Forecast as of 10:00pm

14 cm of snow forecasted, Snow changing to rain with the potential periods of freezing rain.
(Heaviest amounts of precipitation between 2am Saturday to 8am Saturday morning)

-6 at present with temps rising above zero after 12pm Saturday to 6 AM Sunday then dropping significantly

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 10:00pm on Friday December 16, 2016

Arterial Road
Salters deployed Dec 16 9:00pm est completion 11:30 pm

Collector Roads
Salters deployed 9:25 pm estimated completion 2:00am Dec 17

Local Roads
No Activity

Laneway Roads
salting on going until completed

Humber Bay Waterfront Trail
Salter/plow deployed 9:00pm estimated completion 3:00am

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
Senior clearing scheduled Dec 17 6:00am

Download (PDF, 234KB)

Updated December 16 2016 - 6:00 pm

Forecast as of 6:00pm
1 cm of snow forecasted from 8pm Friday evening to 2pm Saturday changing to rain with the potential periods of freezing rain.
(Heaviest amounts of precipitation between 2am Saturday to 8am Saturday morning)
-7 at present with temps rising above zero after 12pm Saturday to 6 AM Sunday then dropping significantly

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 6:00pm on Friday December 16, 2016

Arterial Road
No Current Activities

Collector Roads
No Current Activities

Local Roads
2nd round salting 8:00am Completed 5:30pm

Laneway Roads
salting 12:01am Dec 16 on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
Sidewalk plowing and salting deployed 1:00am Completed 4:00pm Dec 16

Bus Stops and Crosswalks
Bus stop clearing and salting deployed 4:00am Dec 16 ongoing until completed estimated Dec 18 4:00am

Seniors Sidewalks
Senior clearing scheduled to resume Dec 17 6:00am

Download (PDF, 235KB)

Updated December 16 2016 - 2:00 pm

Forecast as of 2:00pm
1 cm of snow forecasted from 8pm Friday evening to 2pm Saturday changing to rain with the potential periods of freezing rain.
(Heaviest amounts of precipitation between 2am Saturday to 8am Saturday morning)
-7 at present with temps rising above zero after 12pm Saturday to 6 AM Sunday then dropping significantly

Summary of winter maintenance activities
PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 2:00pm on Friday December 16, 2016

Arterial Road
Clean up operations Parking and bike lanes 6:00am to 9:55am

Collector Roads
3 rd round Salting completed 8:30am

Local Roads
2nd round salting 8:00am est completion 6:00pm

Laneway Roads
salting 12:01am Dec 16 on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
Sidewalk plowing and salting deployed 1:00am Dec 16 estimated completion 4:00pm Dec 16

Bus Stops and Crosswalks
Bus stop clearing and salting deployed 4:00am Dec 16 ongoing until completed estimated Dec 18 4:00am

Seniors Sidewalks
Senior clearing commenced 6:00am completed for the day 2:30pm
Scheduled to resume Dec 17 6:00am

Download (PDF, 236KB)

Updated December 16 2016 - 8:00 am

Forecast as of 8:00am

Possible flurries all day with 1-3 cm accumulation
14 cm of snow forecasted from 8pm Friday evening to 2pm Saturday changing to rain with the potential periods of freezing rain.
(Heaviest amounts of precipitation between 2am Saturday to 8am Saturday morning)
low today (-11) with temps rising above zero after 12pm Saturday

Summary of winter maintenance activities

PLEASE SEE THE ATTACHED ADVISORY FOR DETAILS

As of 8:00am on Friday December 16, 2016

Arterial Road
Bike lanes 9:00am Estimated completion 12:00 noon
Clean up operations Parking 6:00am to 9:00am EST
Plowing completed 7:00 Dec 15 to 4:00am Dec 16 (No driveway opening on arterials)
2 round of salting complete

Collector Roads
3 rd round Salting completed Est 8:30am
plowing completed 3:00am
2 rounds of salting overnight

Local Roads
2nd round salting 8:00am est completion 6:00pm
plowing began 3:00am completed 8:00am
Salters deployed 6:40 am Completed 5:15pm

Laneway Roads
salting 12:01am Dec 16 on going until completed

Humber Bay Waterfront Trail
2 rounds of plowing and salting completed

Sidewalks
Sidewalk plowing and salting deployed 1:00am Dec 16 estimated completion 3:00pm Dec 16

Bus Stops and Crosswalks
Bus stop clearing and salting deployed 4:00am Dec 16 ongoing until completed estimated Dec 18 4:00am

Seniors Sidewalks
Senior clearing commenced 6:00am Dec 16 estimated completion Dec 18 2:30pm

Download (PDF, 243KB)

Updated December 15 2016 - 6:45 pm

Forecast as of 6:45pm

Special weather advisory - Snow squalls may quickly accumulate to 8pm up to 5-10 cm
20 cm of snow forecasted from 8pm Friday evening to noon Saturday (heaviest amounts between 10pm Friday and 3 am Saturday morning)
Changing to rain 2:00pm Saturday

Summary of winter maintenance activities

As of 6:45pm on Thursday December 15, 2016

Arterial Road
Plowing deployed Dec 15 6:30pm est completion 11:00pm
1 round of salting completed 6:30pm

Collector Roads
plowing scheduled to be deployed 10:00pm est completion 4:00am Dec 16
Salters deployed Eglinton North 3:30pm Est Completion 7:00pm
Salters south of Eglinton 4:10pm Est Completion 9:00pm

Local Roads
plowing to be deployed immediately following completion of collector routes estimated 4:00am
Salters deployed 6:40 am Completed 5:15pm

Laneway Roads
salting scheduled to be deployed 6:30am Dec 16 on going until completed

Humber Bay Waterfront Trail
one round of plowing and salting completed 4:30pm to 6:30pm

Sidewalks
Sidewalk plowing and salting scheduled to be deployed 1:00am Dec 16 estimated completion 2:00pm Dec 16

Bus Stops and Crosswalks
Bus stop clearing and salting scheduled to be deployed 4:00am ongoing until completed estimated Dec 18 4:00am

Seniors Sidewalks
Senior clearing scheduled to commence 6:00am Dec 16 estimated completion Dec 18 2:30pm


Download (PDF, 239KB)

Updated December 15 2016 - 3:30 pm

Forecast as of 3:30pm

Forecasting - snow squalls today in the 1cm to 3 cm range
20 cm of snow forecasted from 9pm Friday evening to 8pm Saturday
Changing to rain 5:00pm Saturday

Summary of winter maintenance activities

As of 3:30pm on Thursday December 15, 2016

Arterial Road
Salters deployed Eglinton North 3:00pm Est Completion 5:30pm
Salters deployed to loaded standby points South of Eglinton 4:00pm

Collector Roads
Salters deployed Eglinton North 3:30pm Est Completion 7:00pm
Salters deployed to loaded standby points South of Eglinton 4:00pm
Salters deployed 4:13am Completion 9:00am

Local Roads
Salters deployed 6:40 am Estimated Completion 5:00pm

Laneway Roads
No Current Activity

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
Manual cleaning of steps 6:30 am to 2:30 pm completed

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 238KB)

Updated December 15 2016 - 7:30 am

Forecast as of 7:30am
Forecasting - snow squalls today in the 1cm to 3 cm range
20 cm of snow forecasted from 9pm Friday evening to 8pm Saturday
changing to rain 5:00pm Saturday

Summary of winter maintenance activities

As of 7:30am on Thursday December 15, 2016

Arterial Road
Salters deployed 3:36 am Completed 7:43 am
Spot salting deployed 9:40 pm Dec 14 Completed 12:30am Dec 15

Collector Roads
Salters deployed 4:13am Estimated Completion 9:15 am

Local Roads
Salters deployed 6:40 am Estimated Completion 4:40pm

Laneway Roads
No Current Activity

Humber Bay Waterfront Trail
Salt/plowing deployed 5:36am Completed 7:00am Dec 15
Spot salting deployed 9:40 pm Dec 14 Completed 11:00pm Dec 14

Sidewalks
Manual cleaning of steps 6:30 am to 2:30 pm

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 333KB)

Updated December 14 2016 - 10:00 pm

Forecast as of 10:00 pm:
Friday/Saturday – now calling for 18cm from 9pm Friday to Noon Saturday changing over to rain (heaviest amounts between 12:01am and and 9am Saturday morning)
Sunday – 1cm of snow

Summary of winter maintenance activities
As of 10:00 pm on Wednesday December 14, 2016

Arterial Roads
Spot salting deployed 9:40 pm Est Completion 12:30am Dec 15

Collector Roads
No Current Activity

Local Roads
No Current Activity

Laneway Roads
No Current Activity

Humber Bay Waterfront Trail
Spot salting deployed 9:40 pm Est Completion 12:30am Dec 15

Sidewalks
No Current Activity

Bus Stops and Crosswalks
No Current Activity

Senior Sidewalks
No Current Activity

Download (PDF, 333KB)

Updated December 14 2016 - 3:00 pm

Forecast as of 3:00 pm:
Friday/Saturday – now calling for 18cm from 9pm Friday to Noon Saturday changing over to rain (heaviest amounts between 12:01am and and 9am Saturday morning)
Sunday – 1cm of snow

Summary of winter maintenance activities
As of 3:00 pm on Wednesday December 14, 2016

Arterial Roads
No Current Activity

Collector Roads
No Current Activity

Steep Local Roads
Anti Icing Scheduled to be deployed 10:00am Dec 14 completed 2:15pm Dec 14

Local Roads
Local Plow trucks deployed for clean up operations and service requests 6:30am Completion 3:30pm

Laneway Roads
Salters deployed 6 am on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
No Current Activity

Bus Stops and Crosswalks
No Current Activity

Senior Sidewalks
Seniors program Completion 2:30pm

Download (PDF, 337KB)

Updated December 14 2016 - 7:30 am

Forecast as of 7:30 am:
Wednesday – 3cm of snow from 2pm to 5pm
Thursday – 2cm of snow from 12:01am to 5am and again 2cm from 2pm to 7pm
Friday/Saturday – now calling for 17cm from 8pm Friday to Noon Saturday changing over to rain (heaviest amounts between 12:01am and and 9am Saturday morning)
Sunday – 1cm of snow from 9pm Saturday evening to 7am Sunday morning
Total – 25cm

Summary of winter maintenance activities
As of 7:30 pm on Wednesday December 14, 2016

Arterial Roads
Anti Icing deployed 10:00pm completed 4:15am Dec 14/span>

Collector Roads
Anti Icing deployed 10:00pm est completion 4:15am Dec 14

Steep Local Roads
Anti Icing Scheduled to be deployed 10:00am Dec 14 Est completion 4:00pm Dec 14

Local Roads
No Current Activity

Laneway Roads
Salters completed laneways 6:00am Dec 14

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
No Current Activity

Bus Stops and Crosswalks
Bus stops deployed 8:00am Dec 12 completed Dec 14 6:00am

Senior Sidewalks
Seniors program resumed 6:00am estimated completion 2:30pm today

GDE Error: Error retrieving file - if necessary turn off error checking (404:Not Found)

Updated December 13 2016 - 3:30 pm

Forecast as of 3:30 pm:
Wednesday – 2cm of snow from 2pm to Thursday 7am
Thursday – 2cm of snow from 9am to 6pm
Friday/Saturday – now calling for 14cm from 8pm Friday to Noon Saturday (heaviest amounts between 10pm Friday evening and 7am Saturday morning)
Sunday – 2cm of snow from 5am to 7am
Total – 20cm

Summary of winter maintenance activities
As of 3:30 pm on Tuesday December 13, 2016

Arterial Roads
Anti Icing Scheduled to be deployed 10:00pm est completion 3:00am Dec 14
AM clean up of parking areas 6:00am to 9:55am Completed

Collector Roads
Anti Icing Scheduled to be deployed 10:00pm est completion 3:00am Dec 14
Collector Plow trucks deployed for clean up operations and service requests 6:30am Completed 3:30pm

Steep Local Roads
Anti Icing Scheduled to be deployed 10:00am Dec 14 Est completion 4:00pm Dec 14

Local Roads
Local Plow trucks deployed for clean up operations and service requests 6:30am Completion 3:30pm

Laneway Roads
Salters deployed 6 am on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
4 Tractors Deployed 6:30 am Completed 5:00pm

Bus Stops and Crosswalks
Bus stops deployed 8:00am ongoing until completed EST Dec 14 8:00am

Senior Sidewalks
Seniors program completed for day 2:30pm Dec 13
scheduled to resume Dec 14 6:00am on going until completed EST Dec 14 2:30pm

Download (PDF, 345KB)

Updated December 13 2016 - 7:30 am

Forecast as of 7:30 am:
Wednesday – forecasting 1cm of snow from 3pm to 5pm
Thursday – forecasting 2cm of snow from 9am through 6pm
Friday/Saturday forecast approximately 16cm from 8pm Friday to Noon Saturday

Summary of winter maintenance activities
As of 7:30 am on Tuesday December 13, 2016

Arterial Roads
AM clean up of parking areas 6:00am to 9:00am
PM clean up of parking areas 4:00pm Completed 7:30pm Dec 12
Layby Parking 12:01 am Completed 5:15 am

Collector Roads
Collector Plow trucks deployed for clean up operations and service requests 6:30am Estimated completion 2:30pm

Local Roads
Local Plow trucks deployed for clean up operations and service requests 6:30am Estimated completion 2:30pm
Local Salters deployed 1:00pm Completed 11:00pm

Laneway Roads
Salters deployed 6 am on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
No Current Activity

Bus Stops and Crosswalks
Bus stops deployed 8:00am ongoing until completed EST Dec 14 8:00am

Senior Sidewalks
Seniors resumed 6:00am Dec 13 on going until completed EST Dec 14 2:30pm

Download (PDF, 341KB)

Updated December 12 2016 - 7:00 pm

Forecast as of 6:30 pm:
Light snow forecasted for Wednesday morning with less than 2 cm accumulation

Summary of winter maintenance activities
As of 6:30 pm on Monday December 12, 2016

Arterial Roads
PM clean up 4:00pm Est completion 7:00pm
Layby Parking 12:01 am Est completion 4:00am Dec13

Collector Roads
Collector Salting deployed 1:00pm Completed 5:25pm

Local Roads
Local Salters deployed 1:00pm Est Completion 11:00pm

Laneway Roads
Salters deployed 6 am on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
No Current Activity

Bus Stops and Crosswalks
Bus stops deployed 8:00am ongoing until completed

Senior Sidewalks
Seniors 6:00am Completed for today 2:30pm
Scheduled to resume 6:00am Dec 13 on going until completed

Download (PDF, 238KB)

Updated December 12 2016 - 4:00 pm

Forecast as of 4:00 pm:
MLight snow forecasted for Wednesday morning with less than 2 cm accumulation

Summary of winter maintenance activities
As of 4:00 pm on Monday December 12, 2016

Arterial Roads
PM clean up 4:00pm Est completion 7:00pm
Layby Parking 12:01 am Est completion 4:00am Dec13
Driveways windrows Completed 1:00pm

Collector Roads
Collector Salting deployed 1:00pm Est Completion 6:00pm
Plowing deployed 1:00am Completed 4:00pm

Local Roads
Local Salters deployed 1:00pm Est Completion 11:00pm
Plowing deployed 1:00am Completed 4:00pm

Laneway Roads
Salters deployed 6 am on going until completed

Humber Bay Waterfront Trail
No Current Activity

Sidewalks
Sidewalk plowing with sand/salting deployed at 11:00 am on high pedestrian sidewalks Completed 4:00pm
Sidewalk plowing with sand/salting deployed at 12:01 am on high pedestrian sidewalks, progressing to the low pedestrian sidewalk immediately after Completed 11:00am

Bus Stops and Crosswalks
Bus stops deployed 8:00am ongoing until completed

Senior Sidewalks
Seniors 6:00am on going until completed

Download (PDF, 239KB)

Updated December 12 2016 - 12:00 noon

Forecast as of 12:00 noon:
Mild Temperatures through to 6:00pm then dipping below Zero overnight.
Next snow fall forecasted for Thursday Dec 15th 3:00am

Summary of winter maintenance activities
As of 12:00 noon on Monday December 12, 2016

Arterial Roads
Bike lane and turning lane clean up Completed 12:00 noon
Driveways windrows Est Completion 1:00pm

Collector Roads
Collector Salting to be deployed 1:00pm Est Completion 6:00pm
Plowing deployed 1:00am Est completion 2:00pm

Local Roads
Local Salters to be deployed 1:00pm Est Completion 11:00pm
Plowing deployed 1:00am Est completion 2:00pm

Laneway Roads
Salters deployed 6 am on going until completed

Humber Bay Waterfront Trail
3 rounds Plowing Completed 9:30pm

Sidewalks
Sidewalk plowing with sand/salting deployedat 12:01 am on high pedestrian sidewalks, progressing to the low pedestrian sidewalk immediately after Estimated completion 1:00pm

Bus Stops and Crosswalks
Bus stops deployed 8:00am ongoing until completed

Senior Sidewalks
Seniors 6:00am on going until completed

Download (PDF, 238KB)

Updated December 12 2016 - 8:00 am

Forecast as of 8:00 am:
1.2 cm more of snow turning to rain and freezing rain by the lake ending at 9:00am
Next snow fall forecasted for Thursday Dec 15th 3:00am

Summary of winter maintenance activities
As of 8:00 am on Monday December 11, 2016

Arterial Roads
Bike lane and turning lane
clean up on going until Noon
Driveways windrows ongoing
3 rounds plowing north of Eglinton completed
2 rounds plowing
south of Eglinton completed

Collector Roads
Plowing deployed 1:00am est completion 2:00pm
2nd round back to back collector salting deployed beginning 6:00pm estimated completion 11:00pm
Collector Salting deployed 3:00pm Completed 6:00pm

Local Roads
Salters deployed 6 am on going until completed

Laneway Roads
3 rounds Plowing Estimated completion 9:30pm

Humber Bay Waterfront Trail
Plowing deployed 9:00pm Estimated completion 10:30pm
2nd round of salting completed 4:00-5:30pm
One round of salting completed 2:00-3:30pm

Sidewalks
Sidewalk plowing with sand/salting deployedat 12:01 am Dec 12th on high pedestrian sidewalks, progressing to the low pedestrian sidewalk immediately after Estimated completion 1:00pm Dec 12

Bus Stops and Crosswalks
Bus stops deployed 8:00am

Senior Sidewalks
Seniors 6:00am on going until completed

Download (PDF, 242KB)

Updated December 11 2016 - 9:45 pm

Forecast as of 9:45 pm:
10cm of snow forecasted began at 3:00pm thru to 12am Monday morning, changing over to rain/snow mix of an additional 1-2 cm ending at approximately 7:00am
Potential for icy conditions 9:00pm this evening to 9:00am Monday morning with the change over to rain.
Higher accumulations north of the 401

Summary of winter maintenance activities
As of 9:45 pm on Sunday December 11, 2016

Arterial Roads
Plowing deployed 9:00pm Estimated completion 1:00am Dec 12
2nd round back to back arterial salting deployed 4:45 Completed 7:30pm
1st round salting deployed 2:00 pm Completed 4:45pm

Collector Roads
2nd round back to back collector salting deployed beginning 6:00pm estimated completion 11:00pm
Collector Salting deployed 3:00pm Completed 6:00pm

Local Roads
Local Salters deployed 3:00pm Est Completion 1:00am Dec12

Laneway Roads
No Activity

Humber Bay Waterfront Trail
Plowing deployed 9:00pm Estimated completion 10:30pm
2nd round of salting completed 4:00-5:30pm
One round of salting completed 2:00-3:30pm

Sidewalks
Sidewalk plowing with sand/salting scheduled to commence at 12:01 am Dec 12th on high pedestrian sidewalks, progressing to the low pedestrian sidewalk immediately after Estimated completion 12:01 noon Dec 12

Bus Stops and Crosswalks
No Activity

Senior Sidewalks
No Activity

Download (PDF, 238KB)

Updated December 11 2016 - 6:00 pm

Forecast as of 6:00 pm:
11 cm of snow began 3:00pm thru to 2am Monday morning, changing over to rain/snow mix of an additional 2-4 cm ending at approximately 7:00am
Potential for icy conditions 9:00pm this evening to 9:00am Monday morning with the change over to rain.
Higher accumulations north of the 401

Summary of winter maintenance activities
As of 6:00 pm on Sunday December 11, 2016

Arterial Roads
2nd round back to back arterial salters deployed 4:45 estimated completion 7:30
Arterial Salters deployed 2:00 pm Completed 4:45pm

Collector Roads
2nd round back to back collector salters deployed beginning 6:00pm estimated completion 10:00pm
Collector Salters deployed 3:00pm Completed 6:00pm

Local Roads
No Activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail
2nd round of salting completed 4:00-5:30pm
One round of salting completed 2:00-3:30pm

Sidewalks
Sidewalk plowing with sand/salting scheduled to commence at 12:01 am Dec 12th on high pedestrian sidewalks, progressing to the low pedestrian sidewalk immediately after Estimated completion 12:01 noon Dec 12

Bus Stops and Crosswalks
No Activity

Senior Sidewalks
No Activity

Download (PDF, 238KB)

Updated December 11 2016 - 3:00 pm

Forecast as of 3:00 pm:
11 cm of snow from 3:00pm thru to 2am Monday morning, changing over to rain/snow mix of an additional 2-4 cm ending at approximately 7:00am
Potential for icy conditions 9:00pm this evening to 9:00am Monday morning with the change over to rain.
Higher accumulations north of the 401

Summary of winter maintenance activities
As of 3:00 pm on Sunday December 11, 2016

Arterial Roads
Arterial Salters deployed 2:00 pm Estimated completion 4:30pm

Collector Roads
Collector Salters deployed 3:00pm Est Completion 6:00pm

Local Roads
Local Salters deployed 3:00pm Est Completion 1:00am Dec12

Laneway Roads
No Activity

Humber Bay Waterfront Trail
One round of salting completed 2:00-3:30pm

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Senior Sidewalks
No Activity

Download (PDF, 235KB)

Updated December 11 2016 - 10:30 am

Forecast as of 10:30 am:
10 cm of snow late morning thru to 2am Monday morning, changing over to rain/snow mix of an additional 2 cm ending at approximately 7:00am Monday
Potential for icy conditions 9:00pm this evening to 9:00am Monday morning with the change over to rain.
Higher accumulations north of the 401

Summary of winter maintenance activities
As of 10:30 am on Sunday December 11, 2016

Arterial Roads
Anti Icing on arterial hills and bridges deployed 10:00pm Dec 10 Completed 4:05am Dec 11

Collector Roads
Anti Icing on collector hills and bridges deployed 10:00pm Dec 10 Completed 4:05am Dec 11

Download (PDF, 235KB)

Updated December 10 2016 - 10:00 pm

Forecast as of 10:00 pm:
13.6 cm of snow forecasted with the majority falling between 3:00pm Sunday and 3:00am Monday

Summary of winter maintenance activities
As of 10:00 pm on Saturday December 10, 2016

Arterial Roads
Anti Icing on arterial hills and bridges deployed 10:00pm estimated completion 3:00am Dec 11

Collector Roads
Anti Icing on collector hills and bridges deployed 10:00pm estimated completion 3:00am Dec 11

Steep Local Roads
Anti Icing on Steep local hills deployed 1:00pm Completed 5:30pm

Download (PDF, 236KB)

Updated December 10 2016 - 1:00 pm

Forecast as of 1:15 pm:
Light flurries of snow today until approximately 6:00pm this evening
and additional 13.0 cm of snow starting between 9:00 am and noon Sunday extending into Monday

Summary of winter maintenance activities
As of 1:15 pm on Saturday December 10, 2016

Arterial Roads
Anti Icing on arterial hills and bridges scheduled to be deployed 10:00pm est completion 3:00am Dec 11

Collector Roads
Anti Icing on collector hills and bridges scheduled to be deployed 10:00pm est completion 3:00am Dec 11

Steep Local Roads
Anti Icing on Steep local hills deployed 1:00pm estimated completion 6:00pm

Download (PDF, 235KB)

Updated December 9 2016 - 3:00 pm

Forecast as of 3:00 pm:
Chance of flurries thru Saturday afternoon less than 1cm
Sunday forecast up to 18cm of snow beginning 2pm Sunday through Monday morning 6am

Summary of winter maintenance activities
As of 3:00 pm on Friday December 9, 2016

Arterial Roads
No Activity

Collector Roads
No Activity

Local Roads
Local Salters deployed 10:10 pm Dec 8 - Completed 8:30am

Laneway Roads
No Activity

Humber Bay Waterfront Trails
No Activity

Sidewalks
Manual salting of Steps 6:30am Completed 2:30 pm

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 233KB)

Updated December 9 2016 - 7:30 am

Forecast as of 7:30 am:
An additional 1 - 2 cm possible from snow squalls through Saturday,
A winter storm approaches developing Sunday morning and lingering through to Monday night with light-moderate snow.

Summary of winter maintenance activities
As of 7:30 am on Friday December 9, 2016

Arterial Roads
Arterial Salters deployed at 7:50pm Dec 8 - Completed 12:10am

Collector Roads
Collector Salters deployed 8:50 pm Dec 8 - Completed 2:00am

Local Roads
Local Salters deployed 10:10 pm Dec 8 - Estimated Completion 8:00am

Laneway Roads
No Activity

Humber Bay Waterfront Trails
Salter deployed 8:30 Completed 10:00pm Dec 8

Sidewalks
Manual salting of Steps 6:30am to 2:30 pm

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 233KB)

Updated December 8 2016 - 9:15 pm

Forecast as of 9:15 pm:
Squalls overnight starting 7:00pm ending at midnight with total accumulations up to 2 cm

Summary of winter maintenance activities
As of 9:15 pm on Thursday December 8, 2016

Arterial Roads
Arterial Salters deployed at 7:50pm estimated completion 10:30pm

Collector Roads
Collector Salters deployed 8:50 pm Estimated completion 1:30am Dec 9

Local Roads
No Activity

Humber Bay Waterfront Trails
Salter deployed 8:30 estimated completion 10:00pm

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 234KB)

Updated December 8 2016 - 5:30 pm

Forecast as of 5:30 pm:
Squalls overnight starting 7:00pm ending at midnight with total accumulations up to 2 cm

Summary of winter maintenance activities
As of 5:30 pm on Thursday December 8, 2016

Arterial Roads
No Activity

Collector Roads
No Activity

Steep Local Roads
Anti-icing commenced on hills at 11:30am applying brine at a rate of 200L/per lane KM COMPLETED 4:00pm

Download (PDF, 233KB)

Updated December 8 2016 - 7:30 am

Forecast as of 7:30 am:
Flurries possible this afternoon
30% POP of 1 to 3cm of snow squalls from 8pm tonight into Friday 1am

Summary of winter maintenance activities
As of 7:30 am on Thursday December 8, 2016

Arterial Roads
Anti-icing commenced on hills and bridges at 11:00 pm Dec 7th applying brine at a rate of 100L/per lane KM (COMPLETED 5:15 am)

Collector Roads
Anti-icing commenced on hills and bridges at 11:00 pm Dec 7th applying brine at a rate of 100L/per lane KM (COMPLETED 5:15 am)

Steep Local Roads
Anti-icing scheduled to commence on hills at 11:30am applying brine at a rate of 200L/per lane KM (Est completion 5:00pm)

Download (PDF, 234KB)

Updated December 5 2016 - 8:00 am

Forecast as of 7:00 am:

Summary of winter maintenance activities
As of 8:00 am on Monday December 5, 2016

Arterial Roads
Arterial Salters deployed 11:40 pm Dec 4 to spot salt - North of Finch Ave Completed 1:30am
1 salter deployed 5:30 am to spot Salt Martin Grove Rd Finch to Steeles Ave Completed 6:05 am

Collector Roads
Collector Salters deployed 12:10am to spot salt - North of Finch Ave . Completed 4:10am

Steep Local Roads
Local Salters deployed 3:00am to spot salt - North of 401. Operations suspended 7:30 am)

Steep Laneway Roads
No Activity

Humber Bay Waterfront Trail
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Senior Sidewalks
No Activity

Download (PDF, 67KB)

Updated November 28 2016 - 8:00 am

Forecast as of 8:00 am:
Dry conditions will continue through Monday, rain expected after 11pm Monday evening

Summary of winter maintenance activities
As of 8:00 am on Monday November 28, 2016

Arterial Roads
Anti-icing commenced on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:01am November 28th)

Collector Roads
Anti-icing commenced on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:01am November 28th)

Steep Local Roads
Anti-icing commenced on hills at 12:00 noon applying brine at a rate of 200L/per lane KM (Completed 5:00pm)

Download (PDF, 235KB)

Updated November 27 2016 - 7:00 pm

Forecast as of 7:00 pm:
Potential for frost conditions especially on bridges between 1am and 7 am overnight. More rain expected after 11pm Monday evening.

Summary of winter maintenance activities
As of 7:00 pm on Sunday November 27, 2016

Arterial Roads
Anti-icing commenced on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:01am November 28th)

Collector Roads
Anti-icing commenced on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:01am November 28th)

Steep Local Roads
Anti-icing commenced on hills at 12:00 noon applying brine at a rate of 200L/per lane KM (Completed 5:00pm)

Download (PDF, 235KB)

Updated November 27 2016 - 1:00 pm

Forecast as of 1:00 pm:
Potential for frost conditions especially on bridges between 1am and 7 am overnight. More rain expected after 11pm Monday evening.

Summary of winter maintenance activities
As of 1:00 pm on Sunday November 27, 2016

Arterial Roads
Anti-icing scheduled to commence on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:01am November 28th)

Collector Roads
Anti-icing scheduled to commence on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:01am November 28th)

Steep Local Roads
Anti-icing commenced on hills at 12:00 noon applying brine at a rate of 200L/per lane KM (Est completion 5:00pm)

Download (PDF, 235KB)

Updated November 24 2016 - 7:15 am

Forecast as of 7:30 am:
Rain will taper off through Thursday afternoon then a dry evening but rain showers are possible later in the night into Friday.

Summary of winter maintenance activities
As of 7:30 am on Thursday November 24, 2016

Arterial Roads
Anti-icing deployed on hills and bridges at 7:00 pm Nov 23 applying brine at a rate of 100L/per lane KM
- Eglinton north Completed 11:20pm Nov 23
- South of Eglinton Suspended 9:45pm Nov 23
Salters deployed 9:45pm completed 1:40am Nov 24th

Collector Roads
Anti-icing deployed on hills and bridges at 7:00 pm Nov 23 applying brine at a rate of 100L/per lane KM
- Eglinton north Completed 11:20pm Nov 23
- South of Eglinton Suspended 9:45pm Nov 23

Steep Collector & Local Roads wards 13 & 17
Anti-icing commenced on steep hills at 12:00 pm Nov 23 applying brine at a rate of 200L/per lane KM Completed 4:00pm Nov 23
Salters deployed 9:45pm Nov 23 completed 4:20am Nov 24th

Download (PDF, 67KB)

Nov 23 2016 - 1:30 pm

Forecast as of 1:30 pm:
Onset of mixed rain/wet snow beginning approx 10pm in the evening ending approx 4:00am Thursday .
Areas south of the 401 1-3 cm of wet snow is expected. 401 north wet snow accumulations of 2 -4 cm is expected.

Summary of winter maintenance activities
As of 6:30 pm on Wednesday November 21, 2016

Arterial Roads
Anti-icing scheduled to commence on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:00am November 24th)

Collector Roads
Anti-icing scheduled to commence on hills and bridges at 7:00 pm applying brine at a rate of 100L/per lane KM (Est completion 12:00am November 24th)

Steep Local Roads
Anti-icing commenced on hills at 12:00 pm applying brine at a rate of 200L/per lane KM (Est completion 4pm November 23rd)

Download (PDF, 67KB)

Nov 21 2016 - 4:45 pm

Forecast as of 4:30 pm:
Special weather statement issued at 11:43am indicates snow squall activity may resume this evening bringing up to 2cm of snow ending later tonight or early Tuesday morning.

Summary of winter maintenance activities
As of 4:45 pm on Monday November 21, 2016

Arterial Roads
Arterial Salters deployed 4:00am to spot salt - Eglinton North and the area bounded by Weston Road, Davenport Rd North to Eglinton Ave. Completed 8:30am

Collector Roads
Collector Salters deployed 4:15 am to spot salt - Eglinton North and the area bounded by Weston Road, Davenport Rd. North to Eglinton Ave. Completed 9:15am

Local Roads
Local Salters deployed 6:15 am to spot salt - Eglinton North Weston Road easterly. Completed 4:45pm

Laneway Roads
No Activity

Humber Bay Waterfront Trail
No Activity

Sidewalks
Manually salting steps 6:30 am - 2:30 pm estimated

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 66KB)

Nov 21 2016 - 8:00 am

Forecast as of 8:00 am:
Weather statement issued at 4:44 am flurries persist today with potential of icy roads again this evening after 9:30 pm.

Summary of winter maintenance activities
As of 8:00 am on Monday November 21, 2016

Arterial Roads
Arterial Salters deployed 4:00am to spot salt on Normal setting - Eglinton North and the area bounded by Weston Road, Davenport Rd North to Eglinton Ave. Estimated completion 8:30am

Collector Roads
Collector Salters deployed 4:15 am to spot salt on Normal setting - Eglinton North and the area bounded by Weston Road, Davenport Rd. North to Eglinton Ave. Estimated completion 9:15am

Local Roads
Local Salters deployed 6:15 am to spot salt on Normal setting - Eglinton North Weston Road easterly . Estimated completion 12:15pm

Laneway Roads
No Activity

Humber Bay Waterfront Trail
No Activity

Sidewalks
Manually salting steps 6:30 am - 2:30 pm estimated

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 66KB)

Nov 20 2016 - 9:00 pm

Forecast as of 9:00 pm:
Special weather statement issued at 3:11pm calling for flurries tonight ending at 7am Monday morning. Potential for icy roads this evening into Monday morning

 Summary of winter maintenance activities
As of 9:00pm on Sunday November 20, 2016

Arterial Roads
Arterial Salters deployed 7:30pm to spot salt on Normal setting - Eglinton North and the area bounded by Weston Road, Davenport Rd North to Eglinton Ave. Estimated completion 10:15 pm

Collector Roads
Collector Salters deployed 8:30pm to spot salt on Normal setting - Eglinton North and the area bounded by Weston Road, Davenport Rd. North to Eglinton Ave. Estimated completion 2:15am

Local Roads
No Activity

Laneway Roads
No Activity

Humber Bay Waterfront Trail
No Activity

Sidewalks
No Activity

Bus Stops and Crosswalks
No Activity

Seniors Sidewalks
No Activity

Download (PDF, 67KB)

Nov 20 2016 - 1:00 pm

Forecast as of 1:00 pm:
Trace to 2cm is expected through Monday morning with slightly higher amounts of 2-4cm north of Hwy. 401

Summary of winter maintenance activities
As of 1:00pm on Sunday November 20, 2016

Arterial Roads
Anti-icing completed on hills and bridges 6:30 am

Collector Roads
Anti-icing completed on hills and bridges 6:30 am

Steep Local Roads
Anti-icing completed on Steep Hills 1:00pm

Download (PDF, 66KB)

Nov 19 2016 - 6:30 pm

Forecast as of 6:30 pm:
Rain changes to periods of rain/snow mix overnight turning to flurries Sunday morning

Summary of winter maintenance activities
As of 6:30 pm on Saturday November 19, 2016

Arterial Roads
Anti-icing scheduled to commence on hills and bridges at 8:00 pm applying brine at a rate of 100L/per lane KM (Est completion 2:00am November 20th)

Collector Roads
Anti-icing scheduled to commence on hills and bridges at 8:00 pm applying brine at a rate of 100L/per lane KM (Est completion 2:00am November 20th)

Steep Local Roads
Anti-icing scheduled to commence on hills at 6:00 am applying brine at a rate of 200L/per lane KM (Est completion 12 noon November 20th)

Download (PDF, 66KB)