Major track work is planned at Osler/Pelham track area this Saturday, June 13 from 9:00 a.m. to 1:00 a.m. and on Sunday, June 14 from 11:00 a.m. to 4:00 p.m.  Residents in the area can expect noise from excavators and trucks with back up beepers as well as surfacing equipment.  CP apologizes in advance for the disruption.

Notice of railroad work – North Toronto Sub, Toronto, ON

Please take note CP has construction work scheduled to begin May 11 east of the railway crossing on Osler Street in Toronto. This important work is part of a signal system upgrade that will enhance the safe operations of rail traffic in the area.


Download (PDF, 188KB)